NYCDDC Emergency Program at Bellevue Men’s Shelter

Client/Owner:
New York City Department of Design and Construction (NYCDDC)
Location:
Manhattan, New York
Estimated Cost:
$20 M
Market/Sector:
Civic Facilities
Services Provided:
Construction Management
Completion Year:
2025

Structure Stabilized. Safe Shelter Restored.

The New York City Department of Design and Construction (NYCDDC) issued four emergency work orders to address critical structural deficiencies at the NYC Department of Homeless Services (NYCDHS) Men’s Shelter at Bellevue. The project included geotechnical evaluations and inspections of the building’s basement and cellar columns, beams, and slabs, as well as repairs to the exterior masonry façade.

The scope of work involved stabilizing, shoring, bracing, reinforcing, probing, and surveying structural elements. Repairs to the exterior façade were coordinated with the Architect of Record. The project required close collaboration among NYCDHS, NYCDDC, Thornton Tomasetti, Acheson Doyle Partners Architects, and Bradford Construction Corp. (Bradford), a WBE joint venture partner with Hunter Roberts.

Bradford provided construction management services across all project phases including pre-construction, construction, and post-construction including:

• Procurement of construction contractors and specialty firms

• Installation of sidewalk shedding, scaffolding, and shoring

• Demolition and removal of existing encasements around structural columns, beams, and slabs

• Probing of structural members and excavation of pile caps and piles

• Demolition, removal, replacement, and repointing of the exterior building façade

• Inspections, supervision, coordination, project tracking and reporting

• Contract oversight and preparation/review of pay requisitions